Time planner for the red line at LKAB in Kiruna

Tidplanering Erik Kruukka på SITE 03 2400x1256 px

SITE was tasked with scheduling a project where belt conveyors on the “red line” are to be replaced. We have extensive experience from LKAB’s operations and were entrusted with coordinating a common timetable for all the different technical areas in…

Stacker machine to the port of Narvik

Stacker machine Narvik harbour SITE

The project was carried out as a comprehensive undertaking (NLM) of a new, redesigned stacker for the port of Narvik. This included everything from 3D scanning and production of drawings for manufacturing and assembly, to assembly management and commissioning. Construction,…

Platforms for kettles at SCA in Piteå

Platforms for kettles at SCA in Piteå

Platforms for kettles After an initial status inspection of the facility’s current condition using our 360° camera, it was decided that we would design new platforms. Then preliminary studies and layout work began, which finally resulted in complete drawings for…