Time planner for the red line at LKAB in Kiruna
SITE was tasked with scheduling a project where belt conveyors on the “red line” are to be replaced. We have…
SITE was tasked with scheduling a project where belt conveyors on the “red line” are to be replaced. We have…
SITE was tasked with 3D-scanning an old burner in order to use reverse engineering to manufacture a new, updated burner…
SITE was tasked with developing a new transport trolley for SSAB Luleå that should be able to carry test weights…
SITE was commissioned by LKAB to construct a stair tower with work platform to replace an existing spiral staircase. The…
The project was carried out as a comprehensive undertaking (NLM) of a new, redesigned stacker for the port of Narvik.…
Transporter MAC/MAF unloading Total delivery (NLM) by carrier to MAC/MAF unloading in Malmberget. This overall commitment included everything from project…
Platforms for kettles After an initial status inspection of the facility’s current condition using our 360° camera, it was decided…
Based on the needs of operation and maintenance personnel, as well as applicable laws and standards, we have designed new…
Crane and traverse safety In order for access and maintenance of cranes and traverses to take place in a safe…
Mountain lift renovation In a successful collaboration between GISAB and SITE, the rock games in the Kiruna mine are being…
Management for heavy industry SITE works continuously with management in a project to improve safety with fall protection systems and…